Preliminary design of the OWEL wave energy converter pre-commercial demonstrator
The consortium responsible for the next stage of development of the OWEL wave energy converter will construct and test a large scale, pre-commercial demonstrator. It is expected that this will be installed at Wave Hub during 2013 and grid connected for a testing period lasting around 12 months. This...
Main Authors: | Leybourne, M.T (Author), Batten, W.M.J (Author), Bahaj, A.S (Author), Minns, N. (Author), O'Nians, J. (Author) |
---|---|
Format: | Article |
Language: | English |
Published: |
2013-09-13.
|
Subjects: | |
Online Access: | Get fulltext |
Similar Items
-
Inlet grid-generated turbulence for large-eddy simulations
by: Blackmore, T., et al.
Published: (2013) -
Influence of turbulence on the wake of a marine current turbine simulator
by: Blackmore, Thomas, et al.
Published: (2014) -
The accuracy of the actuator disc-RANS approach for predicting the performance and far wake of a horizontal axis tidal stream turbine
by: Batten, W.M.J, et al.
Published: (2013) -
Comparative performance of a novel oscillating water column wave energy converter
by: Minns, Julian
Published: (2012) -
Comparison between CFD simulations and experiments for predicting the far wake of horizontal axis tidal turbines
by: Harrison, M.E, et al.
Published: (2010)