Preliminary design of the OWEL wave energy converter pre-commercial demonstrator
The consortium responsible for the next stage of development of the OWEL wave energy converter will construct and test a large scale, pre-commercial demonstrator. It is expected that this will be installed at Wave Hub during 2013 and grid connected for a testing period lasting around 12 months. This...
Main Authors: | , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
2013-09-13.
|
Subjects: | |
Online Access: | Get fulltext |