Multi-objective optimization of operational variables in a waste incineration plant

One of the primary objectives of the operation of a waste incineration plant is to maximise throughput. However, increasing throughput can intensify the loading on the gas-clean-up system and also cause a violation of operational constraints. This may result in penalty costs due to excessive polluti...

Full description

Bibliographic Details
Main Authors: Anderson, S.R (Author), Kadirkamanathan, V. (Author), Chipperfield, A.J (Author), Sharifi, V. (Author), Swithenbank, J. (Author)
Format: Article
Language:English
Published: 2005.
Subjects:
Online Access:Get fulltext