Calculation and Analysis of Pipe Joint Settlement Control in Large Back Silting Immersed Tube Tunnel

The use of the segmental pipe section immersed tunnel suffers from several problems, such as complex construction, weak foundation, great water depth, great thickness of siltation back on the top of the tube, and difficult settlement control. Based on Winkel’s elastic foundation beam theory, a mecha...

Full description

Bibliographic Details
Main Authors: Li, Z. (Author), Wu, G. (Author), Yue, X. (Author)
Format: Article
Language:English
Published: MDPI 2023
Subjects:
Online Access:View Fulltext in Publisher
View in Scopus