Numerical Simulation Study to Investigate Expected Productivity Improvement Using the "Slot-Drill" Completion
The "slot-drill" completion method, which utilizes a mechanically cut high-conductivity "slot" in the target formation created using a tensioned abrasive cable, has been proposed as an alternative stimulation technique for shale-gas and other low/ultra-low permeability formations...
Main Author: | |
---|---|
Other Authors: | |
Format: | Others |
Language: | en_US |
Published: |
2012
|
Subjects: | |
Online Access: | http://hdl.handle.net/1969.1/ETD-TAMU-2012-05-11184 |