Assesment of Riverbed Change Due to the Operation of a Series of Gates in a Natural River
Changes in the bed of Geum River (L=130 km from Daechung regulation dam to Geum River estuarial bank) in South Korea were predicted using the 1-D HEC-RAS model and the 2-D CCHE2D model. Three movable weirs have been installed and dredging has been carried out in Geum River under the Four Major River...
Main Author: | |
---|---|
Other Authors: | |
Format: | Others |
Language: | en |
Published: |
2013
|
Subjects: | |
Online Access: | http://hdl.handle.net/1969.1/149327 |