Understanding the current 30-year shipbuilding plan through three models
Approved for public release; distribution is unlimited === The United States Navy is bound by federal law to annually submit a long-range plan for the construction of naval vessels. As the report represents a possible vision of the future fleet, there is much discussion on its contents and how and w...
Main Author: | Blind, Patrick E. |
---|---|
Other Authors: | Candreva, Philip |
Published: |
Monterey, California: Naval Postgraduate School
2015
|
Online Access: | http://hdl.handle.net/10945/44522 |
Similar Items
-
A stakeholder analysis of the Navy's thirty-year shipbuilding plan
by: O'Loughlin, Patrick Ryan
Published: (2012) -
Analyze the Strategy of the China Navy Through the China Navy’s Shipbuilding Plan
by: LIN,JIN-SHUEN, et al.
Published: (2019) -
CURRENT APPROACHES TO THE MANAGEMENT OF NAVAL SHIPBUILDING PROJECTS
by: Andrija Ljulj, et al.
Published: (2021-01-01) -
The Three-dimensional Digital Factory for Shipbuilding Technology Research
by: Xu Wei, et al.
Published: (2016-01-01) -
Shipbuilding integration
by: Carter, Joanna M.
Published: (2012)