Understanding the current 30-year shipbuilding plan through three models
Approved for public release; distribution is unlimited === The United States Navy is bound by federal law to annually submit a long-range plan for the construction of naval vessels. As the report represents a possible vision of the future fleet, there is much discussion on its contents and how and w...
Main Author: | |
---|---|
Other Authors: | |
Published: |
Monterey, California: Naval Postgraduate School
2015
|
Online Access: | http://hdl.handle.net/10945/44522 |