Analysis of the effects of Marine Corps M1A1 Abram’s tank age on operational availability

Approved for public release; distribution is unlimited === The M1A1 Abram’s Main Battle Tank (MBT) is expected to remain a key piece of USMC equipment beyond 2025. Because the majority of equipment life-cycle costs occur in the operations and support phase, it is imperative that program managers inc...

Full description

Bibliographic Details
Main Authors: Scruggs, Andrew M., Welch, Ryan P.
Other Authors: Naegle, Brad
Published: Monterey, California: Naval Postgraduate School 2014
Online Access:http://hdl.handle.net/10945/42724