Incorporation of tropical cyclone avoidance into automated ship scheduling

Approved for public release; distribution is unlimited === The U.S. Navy’s Combat Logistics Force (CLF) provides at-sea resupply to U.S. and allied vessels throughout the world. The CLF scheduling system anticipates demand and schedules 45 days in advance to meet that demand. Tropical cyclones (TCs)...

Full description

Bibliographic Details
Main Author: Lantz, Stephen W.
Other Authors: DeGrange, Walter
Published: Monterey, California: Naval Postgraduate School 2014
Online Access:http://hdl.handle.net/10945/42670