Analysis of setup time reductions at NADEP, North Island, utilizing the SMED approach (Single-Minute-Exchange-of-Die)
Approved for public release; distribution is unlimited. === This thesis is an analysis of setup time considerations currently employed by the Power Plant Facility at the Naval Aviation Depot, North Island. The system is analyzed within a production context, citing present procedures that adversely a...
Main Author: | |
---|---|
Other Authors: | |
Published: |
Monterey, California: Naval Postgraduate School
2013
|
Online Access: | http://hdl.handle.net/10945/27731 |