A comparison of alternative methods of obtaining Defense Logistics Agency (DLA) cognizance spare parts for Contractor Furnished Equipment (CFE) during initial outfitting of U.S. Navy ships
Approved for public release; distribution is unlimited === This thesis is a limited determination of the most cost effective method of acquiring Defense Logistics Agency (DLA) cognizance initial outfitting material for new construction ships. The study is restricted to Contractor Furnished Material...
Main Author: | Pinkerton, Kim Gregory |
---|---|
Other Authors: | Gates, William R. |
Language: | en_US |
Published: |
Monterey, California. Naval Postgraduate School
2013
|
Online Access: | http://hdl.handle.net/10945/26416 |
Similar Items
-
Excess outfitting materials in Ship Construction Navy (SCN)--shipbuilding programs: an analysis of the initial allowance development process.
by: Feierabend, Richard H.
Published: (2012) -
The Best Mode Of Navy Ship Spare Parts Procurement
by: Tsai, Shufen, et al.
Published: (2012) -
HIERARCHICAL RANKING AS BASIS FOR SHIP OUTFITTING PROCESS IMPROVEMENT
by: Marko Hadjina, et al.
Published: (2018-01-01) -
Discussion of the Relationship between Logistics Management of Navy In-Service Vessels and Contractors by Performance-Based Logistics
by: Huang, Yung-Shun, et al.
Published: (2013) -
media newshawk to police agency public relations cognize inquiries
by: Chang-tai ping, et al.
Published: (2005)