A comparison of alternative methods of obtaining Defense Logistics Agency (DLA) cognizance spare parts for Contractor Furnished Equipment (CFE) during initial outfitting of U.S. Navy ships
Approved for public release; distribution is unlimited === This thesis is a limited determination of the most cost effective method of acquiring Defense Logistics Agency (DLA) cognizance initial outfitting material for new construction ships. The study is restricted to Contractor Furnished Material...
Main Author: | |
---|---|
Other Authors: | |
Language: | en_US |
Published: |
Monterey, California. Naval Postgraduate School
2013
|
Online Access: | http://hdl.handle.net/10945/26416 |