Analyzing cost, schedule, and engineering variances on acquisitions programs
MBA Professional Report === This study of cost, schedule, and engineering variance (CV, SV, and EV) data identified in the Selected Acquisition Reports (SARs) of acquisition programs indicates that early program variances are significantly associated with future program variances. An enhanced unders...
Main Authors: | , |
---|---|
Other Authors: | |
Published: |
Monterey, California. Naval Postgraduate School
2012
|
Online Access: | http://hdl.handle.net/10945/10615 |