Time-dependent seismic hazard in mining.
A project report submitted to the Faculty of Mining Engineering, University of the Witwatersrand, Johannesburg, in partial fulfilment of the requirements for the degree of Master of Science in Engineering. === A strategy to determine the probability that a mining induced seismic event will occur...
Main Author: | |
---|---|
Format: | Others |
Language: | en |
Published: |
2018
|
Subjects: | |
Online Access: | https://hdl.handle.net/10539/24377 |