Investigation into reheater drying during boiler shut down
Boiler tube failures (BTF) are the leading cause of plant downtime and can cost utilities tens of millions of dollars. One of the mechanisms of BTF is pitting corrosion in the steam side of tubes of reheater and superheater tubes. Pitting corrosion in these tubes is a result of poor shut down and...
Main Author: | |
---|---|
Format: | Others |
Language: | en |
Published: |
2015
|
Online Access: | http://hdl.handle.net/10539/18375 |