Validation of the deck behaviour due to post-tension loading of Ashton arch bridge
The new Ashton Bridge is a concrete tied-arch structure with a cable-supported deck, which spans 110 metres below the arching ribs. The tie-beam members, connecting the arch ribs, each have six longitudinal tendons that have primarily straight profiles. The author set out to validate the structural...
Main Author: | |
---|---|
Other Authors: | |
Format: | Dissertation |
Language: | English |
Published: |
Faculty of Engineering and the Built Environment
2020
|
Subjects: | |
Online Access: | https://hdl.handle.net/11427/31783 |