Uncertainty analysis of the PBMR turbo machines / H.P. van der Linde.
The aim of this study was to quantify the amount of uncertainty that surrounds the design of the PBMR turbo machines. The PBMR plant is a first-of-a-kind engineering effort in which a closed loop intercooled Brayton cycle is used to extract nuclear energy from a pebble bed reactor. Until the plant h...
Main Author: | Van der Linde, Hendrik Petrus |
---|---|
Language: | en |
Published: |
North-West University
2011
|
Online Access: | http://hdl.handle.net/10394/4704 |
Similar Items
-
Uncertainty analysis of the PBMR turbo machines / H.P. van der Linde.
by: Van der Linde, Hendrik Petrus
Published: (2011) -
Bestuurstrategieë van die skoolhoof vir die hantering van die onderwyseres met uitbranding / Albert Hendrik van der Linde
by: Van der Linde, Albert Hendrik
Published: (2013) -
Bestuurstrategieë van die skoolhoof vir die hantering van die onderwyseres met uitbranding / Albert Hendrik van der Linde
by: Van der Linde, Albert Hendrik
Published: (2013) -
Predictors of education technology's effects on it students' performance / S. van der Linde
by: Van der Linde, Suné
Published: (2014) -
Predictors of education technology's effects on it students' performance / S. van der Linde
by: Van der Linde, Suné
Published: (2014)