Uncertainty analysis of the PBMR turbo machines / H.P. van der Linde.
The aim of this study was to quantify the amount of uncertainty that surrounds the design of the PBMR turbo machines. The PBMR plant is a first-of-a-kind engineering effort in which a closed loop intercooled Brayton cycle is used to extract nuclear energy from a pebble bed reactor. Until the plant h...
Main Author: | |
---|---|
Language: | en |
Published: |
North-West University
2011
|
Online Access: | http://hdl.handle.net/10394/4704 |