Sediment transport in sewers
Sewers have been designed on the concept of self-cleansing where sediments are expected to move continuously without deposition. Due to the intermittent nature of the flow, deposition of solids in sewers could still occur especially at low flows such as during the receding flow or dry weather flow....
Main Author: | |
---|---|
Published: |
University of Newcastle Upon Tyne
1993
|
Subjects: | |
Online Access: | http://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.357043 |