The Time Value of Risk - A Case Study at the Boron Operations Open Pit Mine
The evaluation of risk is often performed assuming static conditions when in reality, conditions are continually evolving. In the following dissertation, the evaluation of risk with changing conditions over time is considered for a specific project - placing overburden into an active, open pit mine....
Main Author: | Yost, Raymond Richard |
---|---|
Other Authors: | Kemeny, John |
Language: | EN |
Published: |
The University of Arizona.
2009
|
Subjects: | |
Online Access: | http://hdl.handle.net/10150/195258 |
Similar Items
-
Methodology for a dump design optimization in large-scale open pit mines
by: Jorge Puell Ortiz
Published: (2017-01-01) -
Methodology for a dump design optimization in large-scale open pit mines
by: Puell Ortiz, Jorge
Published: (2017) -
EXPLOITATION OF GLASS SAND ON THE OPEN PIT »VRTLINSKA« (MOSLAVINA, CROATIA)
by: Slavko Vujec, et al.
Published: (1994-12-01) -
Stability of the open pit and dump of the afárka Markuovce gypsum deposit
by: Daňko Jaroslav, et al.
Published: (1999-09-01) -
Behaviour pattern of rock mass haulage energy intensity in deep pits
by: Chernykh, V.V, et al.
Published: (2023)