The Time Value of Risk - A Case Study at the Boron Operations Open Pit Mine
The evaluation of risk is often performed assuming static conditions when in reality, conditions are continually evolving. In the following dissertation, the evaluation of risk with changing conditions over time is considered for a specific project - placing overburden into an active, open pit mine....
Main Author: | |
---|---|
Other Authors: | |
Language: | EN |
Published: |
The University of Arizona.
2009
|
Subjects: | |
Online Access: | http://hdl.handle.net/10150/195258 |