Unit loads in assembly component delivery
A new way of looking at scheduling and lot sizing is proposed by embedding material handling considerations in the determination of optimum delivery policies for a single stage, uniform demand assembly system in a finite horizon. Unit loads are used in place of lots; material handling and container...
Main Author: | |
---|---|
Other Authors: | |
Format: | Others |
Language: | en_US |
Published: |
Virginia Polytechnic Institute and State University
2019
|
Subjects: | |
Online Access: | http://hdl.handle.net/10919/94444 |