Rapid Drawdown Analysis using the Finite Element Method
Rapid drawdown (RDD) occurs when the water level adjacent to a slope or embankment is lowered quickly after a long period of being elevated either at the normal operating level for a dam or in the case of levees, during a prolonged flood. The current state of practice for RDD analysis is a multi-st...
Main Author: | |
---|---|
Other Authors: | |
Format: | Others |
Published: |
Virginia Tech
2015
|
Subjects: | |
Online Access: | http://hdl.handle.net/10919/56955 |