Corrosion rates and the time to cracking of chloride contaminated reinforced concrete bridge components
In order to predict the future needs of existing bridges, Bridge Management Systems use models to predict the time when damage will reach a level to cause repair, rehabilitation, or replacement of the structure. One such model is the deterioration model, which has three distinct phases. The second p...
Main Author: | |
---|---|
Other Authors: | |
Format: | Others |
Language: | en |
Published: |
Virginia Tech
2014
|
Subjects: | |
Online Access: | http://hdl.handle.net/10919/43325 http://scholar.lib.vt.edu/theses/available/etd-06162009-063230/ |