Reduction of unscheduled maintenance of bulk carpet fiber texturizing equipment

This project involved the measurement and reduction of unscheduled equipment maintenance in the final stage of a nylon-6 bulk continuous filament process. The SINTEX operation was selected because the cost of poor quality (COPQ) was estimated to be higher here than elsewhere in the process. An accu...

Full description

Bibliographic Details
Main Author: Benson, Linda A.
Other Authors: Systems Engineering
Format: Dissertation
Published: Virginia Tech 2014
Subjects:
Online Access:http://hdl.handle.net/10919/40803
http://scholar.lib.vt.edu/theses/available/etd-01262010-020249/
id ndltd-VTETD-oai-vtechworks.lib.vt.edu-10919-40803
record_format oai_dc
spelling ndltd-VTETD-oai-vtechworks.lib.vt.edu-10919-408032020-06-13T15:33:01Z Reduction of unscheduled maintenance of bulk carpet fiber texturizing equipment Benson, Linda A. Systems Engineering Blanchard, Benjamin S. Jr. Haas, Thomas W. maintenance texturizing equipment. process improvement carpet fiber manufacture LD5655.V851 1996.B467 This project involved the measurement and reduction of unscheduled equipment maintenance in the final stage of a nylon-6 bulk continuous filament process. The SINTEX operation was selected because the cost of poor quality (COPQ) was estimated to be higher here than elsewhere in the process. An accurate measure of the time lost was obtained by measuring the time spent on unscheduled maintenance for a typical machine for forty-eight days. Area personnel ranked potential causes for the most frequent baseline repairs in a Failure Modes and Effects Analysis (FMEA.) Using the causes listed in the FMEA, an experiment was designed with three treatments; cleaning the draw and separator rolls, checking and adjusting threadpath, and maintaining a vibration standard. Results from the experiment showed that the combination of adherence to a vibration standard and weekly inspection and repair of the threadpath reduced unscheduled maintenance by 69 percent over the baseline. Maintaining the denlonstrated gains would involve monitoring the amount of unscheduled maintenance downtime and require entering the data recorded at each of fourteen lines daily into a database. This would require hundreds of hours per year. Therefore, an automated maintenance reporting system is recommended to allow a timely response to the unscheduled maintenance system possible. Master of Science 2014-03-14T21:27:54Z 2014-03-14T21:27:54Z 1996-05-18 2010-01-26 2010-01-26 2010-01-26 Master's project etd-01262010-020249 http://hdl.handle.net/10919/40803 http://scholar.lib.vt.edu/theses/available/etd-01262010-020249/ LD5655.V851_1996.B467.pdf BTD application/pdf Virginia Tech
collection NDLTD
format Dissertation
sources NDLTD
topic maintenance
texturizing equipment.
process improvement
carpet fiber manufacture
LD5655.V851 1996.B467
spellingShingle maintenance
texturizing equipment.
process improvement
carpet fiber manufacture
LD5655.V851 1996.B467
Benson, Linda A.
Reduction of unscheduled maintenance of bulk carpet fiber texturizing equipment
description This project involved the measurement and reduction of unscheduled equipment maintenance in the final stage of a nylon-6 bulk continuous filament process. The SINTEX operation was selected because the cost of poor quality (COPQ) was estimated to be higher here than elsewhere in the process. An accurate measure of the time lost was obtained by measuring the time spent on unscheduled maintenance for a typical machine for forty-eight days. Area personnel ranked potential causes for the most frequent baseline repairs in a Failure Modes and Effects Analysis (FMEA.) Using the causes listed in the FMEA, an experiment was designed with three treatments; cleaning the draw and separator rolls, checking and adjusting threadpath, and maintaining a vibration standard. Results from the experiment showed that the combination of adherence to a vibration standard and weekly inspection and repair of the threadpath reduced unscheduled maintenance by 69 percent over the baseline. Maintaining the denlonstrated gains would involve monitoring the amount of unscheduled maintenance downtime and require entering the data recorded at each of fourteen lines daily into a database. This would require hundreds of hours per year. Therefore, an automated maintenance reporting system is recommended to allow a timely response to the unscheduled maintenance system possible. === Master of Science
author2 Systems Engineering
author_facet Systems Engineering
Benson, Linda A.
author Benson, Linda A.
author_sort Benson, Linda A.
title Reduction of unscheduled maintenance of bulk carpet fiber texturizing equipment
title_short Reduction of unscheduled maintenance of bulk carpet fiber texturizing equipment
title_full Reduction of unscheduled maintenance of bulk carpet fiber texturizing equipment
title_fullStr Reduction of unscheduled maintenance of bulk carpet fiber texturizing equipment
title_full_unstemmed Reduction of unscheduled maintenance of bulk carpet fiber texturizing equipment
title_sort reduction of unscheduled maintenance of bulk carpet fiber texturizing equipment
publisher Virginia Tech
publishDate 2014
url http://hdl.handle.net/10919/40803
http://scholar.lib.vt.edu/theses/available/etd-01262010-020249/
work_keys_str_mv AT bensonlindaa reductionofunscheduledmaintenanceofbulkcarpetfibertexturizingequipment
_version_ 1719319680882049024