Reduction of unscheduled maintenance of bulk carpet fiber texturizing equipment
This project involved the measurement and reduction of unscheduled equipment maintenance in the final stage of a nylon-6 bulk continuous filament process. The SINTEX operation was selected because the cost of poor quality (COPQ) was estimated to be higher here than elsewhere in the process. An accu...
Main Author: | |
---|---|
Other Authors: | |
Format: | Dissertation |
Published: |
Virginia Tech
2014
|
Subjects: | |
Online Access: | http://hdl.handle.net/10919/40803 http://scholar.lib.vt.edu/theses/available/etd-01262010-020249/ |
id |
ndltd-VTETD-oai-vtechworks.lib.vt.edu-10919-40803 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-VTETD-oai-vtechworks.lib.vt.edu-10919-408032020-06-13T15:33:01Z Reduction of unscheduled maintenance of bulk carpet fiber texturizing equipment Benson, Linda A. Systems Engineering Blanchard, Benjamin S. Jr. Haas, Thomas W. maintenance texturizing equipment. process improvement carpet fiber manufacture LD5655.V851 1996.B467 This project involved the measurement and reduction of unscheduled equipment maintenance in the final stage of a nylon-6 bulk continuous filament process. The SINTEX operation was selected because the cost of poor quality (COPQ) was estimated to be higher here than elsewhere in the process. An accurate measure of the time lost was obtained by measuring the time spent on unscheduled maintenance for a typical machine for forty-eight days. Area personnel ranked potential causes for the most frequent baseline repairs in a Failure Modes and Effects Analysis (FMEA.) Using the causes listed in the FMEA, an experiment was designed with three treatments; cleaning the draw and separator rolls, checking and adjusting threadpath, and maintaining a vibration standard. Results from the experiment showed that the combination of adherence to a vibration standard and weekly inspection and repair of the threadpath reduced unscheduled maintenance by 69 percent over the baseline. Maintaining the denlonstrated gains would involve monitoring the amount of unscheduled maintenance downtime and require entering the data recorded at each of fourteen lines daily into a database. This would require hundreds of hours per year. Therefore, an automated maintenance reporting system is recommended to allow a timely response to the unscheduled maintenance system possible. Master of Science 2014-03-14T21:27:54Z 2014-03-14T21:27:54Z 1996-05-18 2010-01-26 2010-01-26 2010-01-26 Master's project etd-01262010-020249 http://hdl.handle.net/10919/40803 http://scholar.lib.vt.edu/theses/available/etd-01262010-020249/ LD5655.V851_1996.B467.pdf BTD application/pdf Virginia Tech |
collection |
NDLTD |
format |
Dissertation |
sources |
NDLTD |
topic |
maintenance texturizing equipment. process improvement carpet fiber manufacture LD5655.V851 1996.B467 |
spellingShingle |
maintenance texturizing equipment. process improvement carpet fiber manufacture LD5655.V851 1996.B467 Benson, Linda A. Reduction of unscheduled maintenance of bulk carpet fiber texturizing equipment |
description |
This project involved the measurement and reduction of unscheduled equipment
maintenance in the final stage of a nylon-6 bulk continuous filament process. The SINTEX operation was selected because the cost of poor quality (COPQ) was estimated to be higher here than elsewhere in the process. An accurate measure of the time lost was obtained by measuring the time spent on unscheduled maintenance for a typical machine for forty-eight days. Area personnel ranked potential causes for the most frequent baseline repairs in a
Failure Modes and Effects Analysis (FMEA.) Using the causes listed in the FMEA, an experiment was designed with three treatments; cleaning the draw and separator rolls, checking and adjusting threadpath, and maintaining a vibration standard. Results from the experiment showed that the combination of adherence to a vibration standard and weekly inspection and repair of the threadpath reduced unscheduled maintenance by 69 percent over
the baseline.
Maintaining the denlonstrated gains would involve monitoring the amount of unscheduled maintenance downtime and require entering the data recorded at each of fourteen lines daily into a database. This would require hundreds of hours per year. Therefore, an automated maintenance reporting system is recommended to allow a timely response to the unscheduled maintenance system possible. === Master of Science |
author2 |
Systems Engineering |
author_facet |
Systems Engineering Benson, Linda A. |
author |
Benson, Linda A. |
author_sort |
Benson, Linda A. |
title |
Reduction of unscheduled maintenance of bulk carpet fiber texturizing equipment |
title_short |
Reduction of unscheduled maintenance of bulk carpet fiber texturizing equipment |
title_full |
Reduction of unscheduled maintenance of bulk carpet fiber texturizing equipment |
title_fullStr |
Reduction of unscheduled maintenance of bulk carpet fiber texturizing equipment |
title_full_unstemmed |
Reduction of unscheduled maintenance of bulk carpet fiber texturizing equipment |
title_sort |
reduction of unscheduled maintenance of bulk carpet fiber texturizing equipment |
publisher |
Virginia Tech |
publishDate |
2014 |
url |
http://hdl.handle.net/10919/40803 http://scholar.lib.vt.edu/theses/available/etd-01262010-020249/ |
work_keys_str_mv |
AT bensonlindaa reductionofunscheduledmaintenanceofbulkcarpetfibertexturizingequipment |
_version_ |
1719319680882049024 |