Reduction of unscheduled maintenance of bulk carpet fiber texturizing equipment
This project involved the measurement and reduction of unscheduled equipment maintenance in the final stage of a nylon-6 bulk continuous filament process. The SINTEX operation was selected because the cost of poor quality (COPQ) was estimated to be higher here than elsewhere in the process. An accu...
Main Author: | |
---|---|
Other Authors: | |
Format: | Dissertation |
Published: |
Virginia Tech
2014
|
Subjects: | |
Online Access: | http://hdl.handle.net/10919/40803 http://scholar.lib.vt.edu/theses/available/etd-01262010-020249/ |