Considering inventory in service parts logistics network design problems with time-based service constraints

We study the integrated logistics network design and inventory stocking problem as characterized by the interdependency of design and stocking decisions in service parts logistics. These two sets of decisions usually have been considered sequentially in practice, and their associated problems have b...

Full description

Bibliographic Details
Main Author: Candas, Mehmet Ferhat, 1979-
Format: Others
Language:English
Published: 2008
Subjects:
Online Access:http://hdl.handle.net/2152/3203