Semiconductor manufacturing inspired integrated scheduling problems : production planning, advanced process control, and predictive maintenance

This dissertation is composed of three major parts, each studying a problem related to semiconductor manufacturing. The first part of the dissertation proposes a high-level scheduling model that serves as an intermediate stage between planning and detailed scheduling in the usual planning hierarchy....

Full description

Bibliographic Details
Main Author: Cai, Yiwei
Format: Others
Language:English
Published: 2012
Subjects:
Online Access:http://hdl.handle.net/2152/17950