STABILITY ASSESSMMENT OF THE UNDERGROUND SETTLING BASIN CAVERNS OF SUPER MADI HYDROELECTRIC PROJECT,NEPAL
Super Madi Hydrolectric Project (SMHEP) is located in Kaski District of Nepal. It is a run of river scheme with a installed capacity of 44 MW, net head of 295m and design discharge of 18 m^3⁄s.It has planned to build for the fulfillment to minimize the load-shedding problem of Nepal in...
Main Author: | |
---|---|
Format: | Others |
Language: | English |
Published: |
Norges teknisk-naturvitenskapelige universitet, Institutt for geologi og bergteknikk
2012
|
Subjects: | |
Online Access: | http://urn.kb.se/resolve?urn=urn:nbn:no:ntnu:diva-20105 |