FEASIBILITY STUDIES FOR THE UPGRADING OF LUSIWASI HYDRO POWER STATION IN SERENJE DISTRICT OF ZAMBIA
The focus of the thesis study is to conduct feasibility studies for the upgrading of Lusiwasi Hydro Power Station in Serenje District of Zambia. The study was undertaken from January to August 2009. The following were the main activities of the study: 1. Conducting literature review 2. Conducting si...
Main Author: | |
---|---|
Format: | Others |
Language: | English |
Published: |
KTH, Energiteknik
2013
|
Subjects: | |
Online Access: | http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-136722 |