Hjälpkraftsystem med två lågspänningsnivåer
Because of increasing demand of power on Malmbanan the capacity of the existing wires which supply the trains must be increased. This increases the stress on the existing poles and for this reason the system for supplying the loads along the railway is to be removed from the poles and be replaced by...
Main Author: | |
---|---|
Format: | Others |
Language: | Swedish |
Published: |
KTH, Elektriska energisystem
2008
|
Online Access: | http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-118951 |