Hjälpkraftsystem med två lågspänningsnivåer

Because of increasing demand of power on Malmbanan the capacity of the existing wires which supply the trains must be increased. This increases the stress on the existing poles and for this reason the system for supplying the loads along the railway is to be removed from the poles and be replaced by...

Full description

Bibliographic Details
Main Author: Lundgren, Andreas
Format: Others
Language:Swedish
Published: KTH, Elektriska energisystem 2008
Online Access:http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-118951