Optimization of bridge foundation construction schedule under resource and space constraints

碩士 === 國立中興大學 === 土木工程學系所 === 107 === When planning the construction plan, if the resource limitation is not considered, the schedule which only use Critical Path Method (CPM) will have significant different from the existing situation. There will be insufficient resources, resulting in construction...