A study of a two-stage flowshop assembly model with a truncated learning function
碩士 === 逢甲大學 === 統計學系統計與精算碩士班 === 107 === The two-stage three machines assembly scheduling problem has lots of applications in industrial production management. The topic of learning effects (or truncation based) has received growing attention in the field of scheduling. However, it is relatively une...
Main Authors: | PAN,PO-AN, 潘柏安 |
---|---|
Other Authors: | Lin,Win-Chin |
Format: | Others |
Language: | zh-TW |
Published: |
2019
|
Online Access: | http://ndltd.ncl.edu.tw/handle/cxpjd8 |
Similar Items
-
Manufacture and Assembly Scheduling with Batch Setup Times in a Two-Machine Flowshop
by: Po-ting Chen, et al.
Published: (2008) -
A Scheduling Problem to Minimize Total Weighted Tardiness in the Two-Stage Assembly Flowshop
by: Ik Sun Lee
Published: (2020-01-01) -
A Two-Stage Assembly-Type Flowshop Scheduling Problem for Minimizing Total Tardiness
by: Ju-Yong Lee, et al.
Published: (2016-01-01) -
M-machine, no-wait flowshop scheduling with sequence dependent setup times and truncated learning function to minimize the makespan
by: V. Azizi, et al.
Published: (2016-04-01) -
Two-stage flowshop with finite intermediate storage
by: Choi-Hou Kuan, et al.
Published: (2004)