A study of a two-stage flowshop assembly model with a truncated learning function

碩士 === 逢甲大學 === 統計學系統計與精算碩士班 === 107 === The two-stage three machines assembly scheduling problem has lots of applications in industrial production management. The topic of learning effects (or truncation based) has received growing attention in the field of scheduling. However, it is relatively une...

Full description

Bibliographic Details
Main Authors: PAN,PO-AN, 潘柏安
Other Authors: Lin,Win-Chin
Format: Others
Language:zh-TW
Published: 2019
Online Access:http://ndltd.ncl.edu.tw/handle/cxpjd8