Verification of production line in - product inventory sampling
碩士 === 嶺東科技大學 === 企業管理系碩士班 === 106 === Most of the Theory of Constraints (TOC) literature are all about Drum-Buffer-Rope (DBR), a bottleneck process. This study is to simulate the production of tandem production line sampling in the case of capacity constraints. This paper discusses the influence an...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2017
|
Online Access: | http://ndltd.ncl.edu.tw/handle/a4r7kp |