Applying An Overlapped Design Schedule Based Dependency Structure Matrix to Minimize Project Makespan

碩士 === 國立臺灣科技大學 === 工業管理系 === 105 === Design process scheduling is conducted by optimizing human resources or workers allocation to several tasks in project with several real constraint to achieve the objective, minimizing the project makespan. Minimizing the project makespan means minimizing the pr...