Parallel Machine Scheduling with Flexible Maintenance and Resumable Jobs for Minimizing Total Completion Time

碩士 === 國立中央大學 === 工業管理研究所 === 105 === In this article, we consider the problem of scheduling n resumable jobs on the m identical parallel machine with flexible maintenance activities and sequence independent setup time, and the objective is to minimize total completion of jobs. In this past, the maj...

Full description

Bibliographic Details
Main Authors: Shang-Cheng Tsai, 蔡尚澄
Other Authors: Gow-Ji Sheen
Format: Others
Language:en_US
Published: 2017
Online Access:http://ndltd.ncl.edu.tw/handle/38wgum