Parallel Machine Scheduling with Flexible Maintenance and Resumable Jobs for Minimizing Total Completion Time
碩士 === 國立中央大學 === 工業管理研究所 === 105 === In this article, we consider the problem of scheduling n resumable jobs on the m identical parallel machine with flexible maintenance activities and sequence independent setup time, and the objective is to minimize total completion of jobs. In this past, the maj...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | en_US |
Published: |
2017
|
Online Access: | http://ndltd.ncl.edu.tw/handle/38wgum |