The strategy of analysis and research in response to the problem caused by shield tunnel drilling in the gravel

碩士 === 國立中央大學 === 土木工程學系在職專班 === 105 === Abstract The use of shield tunnel has been in practice for a long time and has matured since its introduction into Taiwan. A shield tunnel is contracted for construction after the geological survey and drawing of the design. The construction contractor must a...

Full description

Bibliographic Details
Main Authors: LIN-Ching Yu, 游琳靖
Other Authors: Jyh-Dong Lin
Format: Others
Language:zh-TW
Published: 2017
Online Access:http://ndltd.ncl.edu.tw/handle/q4469p
id ndltd-TW-105NCU05015015
record_format oai_dc
spelling ndltd-TW-105NCU050150152019-05-15T23:17:15Z http://ndltd.ncl.edu.tw/handle/q4469p The strategy of analysis and research in response to the problem caused by shield tunnel drilling in the gravel 潛盾隧道於卵礫石層掘進中引致施工問題之因應對策分析研究與探討 LIN-Ching Yu 游琳靖 碩士 國立中央大學 土木工程學系在職專班 105 Abstract The use of shield tunnel has been in practice for a long time and has matured since its introduction into Taiwan. A shield tunnel is contracted for construction after the geological survey and drawing of the design. The construction contractor must analyze the data based on the geological survey information and supplementary geological reports, excavation path, ground water elevation, covering depth, radius of curvature, the outer diameter of tunnel boring machine and other factors and conditions and discuss with the manufacturer to determine the tunnel boring machine suitable for the geological conditions of this project. The selection and design of the shield machine and the planning and simulation works before the construction can lead to the success of the shield tunnel project or when one of the key factors and process are ignored due to cost consideration may lead to the delay or stop of the work which result in disasters, remedies are sought with tremendous costs incurred to find solutions. Using the actual construction cases, this paper explores and analyzes the issues to be noted and the construction difficulties encountered due to ignorance of the precaution measures as well as the solutions to the issues on the construction site based on the difficulties encountered and the process of the excavation by the tunnel boring machines which may encounter obstacles and have delays in their advances. It is hoped that the insights gained will serve as reference for study and analysis by those who are interested in the design and construction of shield tunnels. Jyh-Dong Lin 林志棟 2017 學位論文 ; thesis 218 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立中央大學 === 土木工程學系在職專班 === 105 === Abstract The use of shield tunnel has been in practice for a long time and has matured since its introduction into Taiwan. A shield tunnel is contracted for construction after the geological survey and drawing of the design. The construction contractor must analyze the data based on the geological survey information and supplementary geological reports, excavation path, ground water elevation, covering depth, radius of curvature, the outer diameter of tunnel boring machine and other factors and conditions and discuss with the manufacturer to determine the tunnel boring machine suitable for the geological conditions of this project. The selection and design of the shield machine and the planning and simulation works before the construction can lead to the success of the shield tunnel project or when one of the key factors and process are ignored due to cost consideration may lead to the delay or stop of the work which result in disasters, remedies are sought with tremendous costs incurred to find solutions. Using the actual construction cases, this paper explores and analyzes the issues to be noted and the construction difficulties encountered due to ignorance of the precaution measures as well as the solutions to the issues on the construction site based on the difficulties encountered and the process of the excavation by the tunnel boring machines which may encounter obstacles and have delays in their advances. It is hoped that the insights gained will serve as reference for study and analysis by those who are interested in the design and construction of shield tunnels.
author2 Jyh-Dong Lin
author_facet Jyh-Dong Lin
LIN-Ching Yu
游琳靖
author LIN-Ching Yu
游琳靖
spellingShingle LIN-Ching Yu
游琳靖
The strategy of analysis and research in response to the problem caused by shield tunnel drilling in the gravel
author_sort LIN-Ching Yu
title The strategy of analysis and research in response to the problem caused by shield tunnel drilling in the gravel
title_short The strategy of analysis and research in response to the problem caused by shield tunnel drilling in the gravel
title_full The strategy of analysis and research in response to the problem caused by shield tunnel drilling in the gravel
title_fullStr The strategy of analysis and research in response to the problem caused by shield tunnel drilling in the gravel
title_full_unstemmed The strategy of analysis and research in response to the problem caused by shield tunnel drilling in the gravel
title_sort strategy of analysis and research in response to the problem caused by shield tunnel drilling in the gravel
publishDate 2017
url http://ndltd.ncl.edu.tw/handle/q4469p
work_keys_str_mv AT linchingyu thestrategyofanalysisandresearchinresponsetotheproblemcausedbyshieldtunneldrillinginthegravel
AT yóulínjìng thestrategyofanalysisandresearchinresponsetotheproblemcausedbyshieldtunneldrillinginthegravel
AT linchingyu qiándùnsuìdàoyúluǎnlìshícéngjuéjìnzhōngyǐnzhìshīgōngwèntízhīyīnyīngduìcèfēnxīyánjiūyǔtàntǎo
AT yóulínjìng qiándùnsuìdàoyúluǎnlìshícéngjuéjìnzhōngyǐnzhìshīgōngwèntízhīyīnyīngduìcèfēnxīyánjiūyǔtàntǎo
AT linchingyu strategyofanalysisandresearchinresponsetotheproblemcausedbyshieldtunneldrillinginthegravel
AT yóulínjìng strategyofanalysisandresearchinresponsetotheproblemcausedbyshieldtunneldrillinginthegravel
_version_ 1719144300426559488