The strategy of analysis and research in response to the problem caused by shield tunnel drilling in the gravel
碩士 === 國立中央大學 === 土木工程學系在職專班 === 105 === Abstract The use of shield tunnel has been in practice for a long time and has matured since its introduction into Taiwan. A shield tunnel is contracted for construction after the geological survey and drawing of the design. The construction contractor must a...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2017
|
Online Access: | http://ndltd.ncl.edu.tw/handle/q4469p |
id |
ndltd-TW-105NCU05015015 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-105NCU050150152019-05-15T23:17:15Z http://ndltd.ncl.edu.tw/handle/q4469p The strategy of analysis and research in response to the problem caused by shield tunnel drilling in the gravel 潛盾隧道於卵礫石層掘進中引致施工問題之因應對策分析研究與探討 LIN-Ching Yu 游琳靖 碩士 國立中央大學 土木工程學系在職專班 105 Abstract The use of shield tunnel has been in practice for a long time and has matured since its introduction into Taiwan. A shield tunnel is contracted for construction after the geological survey and drawing of the design. The construction contractor must analyze the data based on the geological survey information and supplementary geological reports, excavation path, ground water elevation, covering depth, radius of curvature, the outer diameter of tunnel boring machine and other factors and conditions and discuss with the manufacturer to determine the tunnel boring machine suitable for the geological conditions of this project. The selection and design of the shield machine and the planning and simulation works before the construction can lead to the success of the shield tunnel project or when one of the key factors and process are ignored due to cost consideration may lead to the delay or stop of the work which result in disasters, remedies are sought with tremendous costs incurred to find solutions. Using the actual construction cases, this paper explores and analyzes the issues to be noted and the construction difficulties encountered due to ignorance of the precaution measures as well as the solutions to the issues on the construction site based on the difficulties encountered and the process of the excavation by the tunnel boring machines which may encounter obstacles and have delays in their advances. It is hoped that the insights gained will serve as reference for study and analysis by those who are interested in the design and construction of shield tunnels. Jyh-Dong Lin 林志棟 2017 學位論文 ; thesis 218 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 國立中央大學 === 土木工程學系在職專班 === 105 === Abstract
The use of shield tunnel has been in practice for a long time and has matured since its introduction into Taiwan. A shield tunnel is contracted for construction after the geological survey and drawing of the design. The construction contractor must analyze the data based on the geological survey information and supplementary geological reports, excavation path, ground water elevation, covering depth, radius of curvature, the outer diameter of tunnel boring machine and other factors and conditions and discuss with the manufacturer to determine the tunnel boring machine suitable for the geological conditions of this project.
The selection and design of the shield machine and the planning and simulation works before the construction can lead to the success of the shield tunnel project or when one of the key factors and process are ignored due to cost consideration may lead to the delay or stop of the work which result in disasters, remedies are sought with tremendous costs incurred to find solutions. Using the actual construction cases, this paper explores and analyzes the issues to be noted and the construction difficulties encountered due to ignorance of the precaution measures as well as the solutions to the issues on the construction site based on the difficulties encountered and the process of the excavation by the tunnel boring machines which may encounter obstacles and have delays in their advances. It is hoped that the insights gained will serve as reference for study and analysis by those who are interested in the design and construction of shield tunnels.
|
author2 |
Jyh-Dong Lin |
author_facet |
Jyh-Dong Lin LIN-Ching Yu 游琳靖 |
author |
LIN-Ching Yu 游琳靖 |
spellingShingle |
LIN-Ching Yu 游琳靖 The strategy of analysis and research in response to the problem caused by shield tunnel drilling in the gravel |
author_sort |
LIN-Ching Yu |
title |
The strategy of analysis and research in response to the problem caused by shield tunnel drilling in the gravel |
title_short |
The strategy of analysis and research in response to the problem caused by shield tunnel drilling in the gravel |
title_full |
The strategy of analysis and research in response to the problem caused by shield tunnel drilling in the gravel |
title_fullStr |
The strategy of analysis and research in response to the problem caused by shield tunnel drilling in the gravel |
title_full_unstemmed |
The strategy of analysis and research in response to the problem caused by shield tunnel drilling in the gravel |
title_sort |
strategy of analysis and research in response to the problem caused by shield tunnel drilling in the gravel |
publishDate |
2017 |
url |
http://ndltd.ncl.edu.tw/handle/q4469p |
work_keys_str_mv |
AT linchingyu thestrategyofanalysisandresearchinresponsetotheproblemcausedbyshieldtunneldrillinginthegravel AT yóulínjìng thestrategyofanalysisandresearchinresponsetotheproblemcausedbyshieldtunneldrillinginthegravel AT linchingyu qiándùnsuìdàoyúluǎnlìshícéngjuéjìnzhōngyǐnzhìshīgōngwèntízhīyīnyīngduìcèfēnxīyánjiūyǔtàntǎo AT yóulínjìng qiándùnsuìdàoyúluǎnlìshícéngjuéjìnzhōngyǐnzhìshīgōngwèntízhīyīnyīngduìcèfēnxīyánjiūyǔtàntǎo AT linchingyu strategyofanalysisandresearchinresponsetotheproblemcausedbyshieldtunneldrillinginthegravel AT yóulínjìng strategyofanalysisandresearchinresponsetotheproblemcausedbyshieldtunneldrillinginthegravel |
_version_ |
1719144300426559488 |