The strategy of analysis and research in response to the problem caused by shield tunnel drilling in the gravel
碩士 === 國立中央大學 === 土木工程學系在職專班 === 105 === Abstract The use of shield tunnel has been in practice for a long time and has matured since its introduction into Taiwan. A shield tunnel is contracted for construction after the geological survey and drawing of the design. The construction contractor must a...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2017
|
Online Access: | http://ndltd.ncl.edu.tw/handle/q4469p |