Early Slack and Late Slack Optimization for Incremental Timing Driven Placement
碩士 === 國立交通大學 === 資訊科學與工程研究所 === 105 === In the RTL to GDSII VLSI design flow, placement step often plays an important role in timing driven placement problem. Early slack and late slack are mainly discussed in the timing problem during placement stage. In this paper, for the early violation, we mov...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2017
|
Online Access: | http://ndltd.ncl.edu.tw/handle/d483sj |