Programming the Development of MEP BIM Model for Material Requirements during Construction - A Case Study of the Fire-Fighting System
碩士 === 國立成功大學 === 土木工程學系 === 105 === Conflict analysis is one of the most recognized benefits of employing Building Information Modeling (BIM) to the mechanical, electrical and plumbing (MEP) system, especially at the design stage. However, at the construction stage, the MEP professional still striv...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2017
|
Online Access: | http://ndltd.ncl.edu.tw/handle/s387f2 |