Using Six Sigma to analyze the implementation of procurement projects with extra engineering modifications: A case study

碩士 === 中原大學 === 工業與系統工程研究所 === 105 === Company''s outsourcing projects have frequently ended up with unexpected additional projects. The change of designs results in extra cost by 2-3% of the total cost, leading to be still acceptable for project managers. However, if the extra cos...

Full description

Bibliographic Details
Main Authors: Huang-Ting Chen, 陳奐廷
Other Authors: Ping-Shun Chen
Format: Others
Language:zh-TW
Published: 2017
Online Access:http://ndltd.ncl.edu.tw/cgi-bin/gs32/gsweb.cgi/login?o=dnclcdr&s=id=%22105CYCU5030056%22.&searchmode=basic