Self-Tuned Project Duration Prediction Model in Preliminary Design Phase
碩士 === 國立臺灣科技大學 === 營建工程系 === 104 === Because there is less information in preliminary design phase, construction industry usually predict project duration by past experience in similar project. Although it can quickly make predictions, accuracy is poor. This research collected several related liter...
Main Authors: | Chun-Pao Chang, 張鈞堡 |
---|---|
Other Authors: | Min-Yuan Cheng |
Format: | Others |
Language: | zh-TW |
Published: |
2016
|
Online Access: | http://ndltd.ncl.edu.tw/handle/79667419129580138567 |
Similar Items
-
The Preliminary Application of Self-Tuning Regulator in Structural Control
by: Chun-yi Li, et al.
Published: (2009) -
The Development of Mathematical Models for Preliminary Prediction of Highway Construction Duration
by: Williams, Robert C.
Published: (2014) -
Modeless Predictive Current Control for Three-Phase AC/DC Converter
by: Fu-Pao Chuang, et al.
Published: (2015) -
Design and Tuning of Model Predictive Control
by: 邱正和
Published: (1997) -
Duration Prediction Models for Construction Projects in Middle East
by: K. M. M. El-Dash, et al.
Published: (2019-04-01)