Self-Tuned Project Duration Prediction Model in Preliminary Design Phase
碩士 === 國立臺灣科技大學 === 營建工程系 === 104 === Because there is less information in preliminary design phase, construction industry usually predict project duration by past experience in similar project. Although it can quickly make predictions, accuracy is poor. This research collected several related liter...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2016
|
Online Access: | http://ndltd.ncl.edu.tw/handle/79667419129580138567 |