A study of multi-objective parallel machine scheduling problems considering total weighted completion time and total power cost
碩士 === 國立屏東科技大學 === 工業管理系所 === 104 === In the past, most of studies attempted to minimize completion time without concerning the energy consumption during production process. Environment and energy consumption have become major issues nowadays. One of major production costs is energy consumption. Th...
Main Authors: | Chen, Hsin-Mao, 陳欣懋 |
---|---|
Other Authors: | Liu, Cheng-Hsiang |
Format: | Others |
Language: | zh-TW |
Published: |
2016
|
Online Access: | http://ndltd.ncl.edu.tw/handle/91225551176972370918 |
Similar Items
-
Two-agent scheduling to minimize total weighted completion time on parallel identical machines
by: 林玫君
Published: (2013) -
Scheduling correlated parallel machines to minimize maximum lateness and total weighted completion time
by: ZHANG, YUN-XI, et al.
Published: (2018) -
Preemptive Parallel Machines Scheduling Problem with Minimizing Total Completion Time
by: Lo, Yu-Hsuan, et al.
Published: (2019) -
Scheduling Unrelated Parallel-Machine to Minimize Total Weighted Tardiness
by: Yang-Kuei Lin, et al.
Published: (2001) -
Parallel-Machine Scheduling to Minimize Total Weighted Flow Time
by: An-Shih Lee, et al.
Published: (2012)