A study of multi-objective parallel machine scheduling problems considering total weighted completion time and total power cost

碩士 === 國立屏東科技大學 === 工業管理系所 === 104 === In the past, most of studies attempted to minimize completion time without concerning the energy consumption during production process. Environment and energy consumption have become major issues nowadays. One of major production costs is energy consumption. Th...

Full description

Bibliographic Details
Main Authors: Chen, Hsin-Mao, 陳欣懋
Other Authors: Liu, Cheng-Hsiang
Format: Others
Language:zh-TW
Published: 2016
Online Access:http://ndltd.ncl.edu.tw/handle/91225551176972370918