A study of multi-objective parallel machine scheduling problems considering total weighted completion time and total power cost
碩士 === 國立屏東科技大學 === 工業管理系所 === 104 === In the past, most of studies attempted to minimize completion time without concerning the energy consumption during production process. Environment and energy consumption have become major issues nowadays. One of major production costs is energy consumption. Th...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2016
|
Online Access: | http://ndltd.ncl.edu.tw/handle/91225551176972370918 |
id |
ndltd-TW-104NPUS5041014 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-104NPUS50410142017-09-03T04:26:00Z http://ndltd.ncl.edu.tw/handle/91225551176972370918 A study of multi-objective parallel machine scheduling problems considering total weighted completion time and total power cost 考量總加權完工時間與總電力成本之多目標平行機台排程問題之研究 Chen, Hsin-Mao 陳欣懋 碩士 國立屏東科技大學 工業管理系所 104 In the past, most of studies attempted to minimize completion time without concerning the energy consumption during production process. Environment and energy consumption have become major issues nowadays. One of major production costs is energy consumption. The effectiveness of machine usage should be taken into account. Accordingly, this study aims to minimize total weighted completion time (TWCT) and total power cost (TPC). Mathematical model with time-index variables construction and weighted sum method are used to find Pareto-optimal solutions. This study proposed heuristic algorithm named apparent power cost (APC) to shorten computation time. Experimental results indicated that mathematical model with the weighted sum method is capable to find multiple Pareto-optimal solutions. APC can also find the best Pareto-optimal solutions by using less computation time. Liu, Cheng-Hsiang 劉正祥 2016 學位論文 ; thesis 62 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 國立屏東科技大學 === 工業管理系所 === 104 === In the past, most of studies attempted to minimize completion time without concerning the energy consumption during production process. Environment and energy consumption have become major issues nowadays. One of major production costs is energy consumption. The effectiveness of machine usage should be taken into account. Accordingly, this study aims to minimize total weighted completion time (TWCT) and total power cost (TPC). Mathematical model with time-index variables construction and weighted sum method are used to find Pareto-optimal solutions. This study proposed heuristic algorithm named apparent power cost (APC) to shorten computation time. Experimental results indicated that mathematical model with the weighted sum method is capable to find multiple Pareto-optimal solutions. APC can also find the best Pareto-optimal solutions by using less computation time.
|
author2 |
Liu, Cheng-Hsiang |
author_facet |
Liu, Cheng-Hsiang Chen, Hsin-Mao 陳欣懋 |
author |
Chen, Hsin-Mao 陳欣懋 |
spellingShingle |
Chen, Hsin-Mao 陳欣懋 A study of multi-objective parallel machine scheduling problems considering total weighted completion time and total power cost |
author_sort |
Chen, Hsin-Mao |
title |
A study of multi-objective parallel machine scheduling problems considering total weighted completion time and total power cost |
title_short |
A study of multi-objective parallel machine scheduling problems considering total weighted completion time and total power cost |
title_full |
A study of multi-objective parallel machine scheduling problems considering total weighted completion time and total power cost |
title_fullStr |
A study of multi-objective parallel machine scheduling problems considering total weighted completion time and total power cost |
title_full_unstemmed |
A study of multi-objective parallel machine scheduling problems considering total weighted completion time and total power cost |
title_sort |
study of multi-objective parallel machine scheduling problems considering total weighted completion time and total power cost |
publishDate |
2016 |
url |
http://ndltd.ncl.edu.tw/handle/91225551176972370918 |
work_keys_str_mv |
AT chenhsinmao astudyofmultiobjectiveparallelmachineschedulingproblemsconsideringtotalweightedcompletiontimeandtotalpowercost AT chénxīnmào astudyofmultiobjectiveparallelmachineschedulingproblemsconsideringtotalweightedcompletiontimeandtotalpowercost AT chenhsinmao kǎoliàngzǒngjiāquánwángōngshíjiānyǔzǒngdiànlìchéngběnzhīduōmùbiāopíngxíngjītáipáichéngwèntízhīyánjiū AT chénxīnmào kǎoliàngzǒngjiāquánwángōngshíjiānyǔzǒngdiànlìchéngběnzhīduōmùbiāopíngxíngjītáipáichéngwèntízhīyánjiū AT chenhsinmao studyofmultiobjectiveparallelmachineschedulingproblemsconsideringtotalweightedcompletiontimeandtotalpowercost AT chénxīnmào studyofmultiobjectiveparallelmachineschedulingproblemsconsideringtotalweightedcompletiontimeandtotalpowercost |
_version_ |
1718526364788719616 |