Scheduling Of Pipeline Construction Under Space Constraints
碩士 === 國立中興大學 === 土木工程學系所 === 104 === How to arrange limited resources in order to achieve the shortest working periods has continually been a very important research area for construction industries. This study first deeply investigated a NISSAN motor lab case. There are 13 types of pipelines which...
Main Authors: | Hung-Wei Chen, 陳泓維 |
---|---|
Other Authors: | 謝孟勳 |
Format: | Others |
Language: | zh-TW |
Published: |
2016
|
Online Access: | http://ndltd.ncl.edu.tw/handle/83186101917406983725 |
Similar Items
-
Optimization of bridge foundation construction schedule under resource and space constraints
by: Hung-Chang Wang, et al.
Published: (2019) -
Cyclic scheduling with spacing constraints
by: Borsi, John Joseph
Published: (2008) -
Scheduling Construction Projects Under Fuzzy Modelling of Resource Constraints
by: Kulejewski Janusz, et al.
Published: (2018-01-01) -
The Acceleration of Pipeline Workloads under the FPGA Area and Bandwidth Constraints
by: Wei-Ning Huang, et al.
Published: (2014) -
Studies on Scheduling Malleable Tasks under Precedence Constraints
by: Chi-YehChen, et al.
Published: (2012)